韦德体育-bevictor韦德体育官网-韦德体育官方网站韦德体育

威尼斯人注册 最好的网络彩票推荐 最大网赌网站 电子竞技博彩帮助 澳门新濠天地体育
Location:Home > detail
Section III of Guangzhou-Shenzhen-Hong Kong Railway
Source:CREC Date:2018年11月27日

With a total length of 7.328 kilometers, the project is located at Shenzhen, Guangdong Province. It started in 2008 and opened to traffic in December, 2010. It mainly includes 3.578-kilometer-long roadbed, six bridges with a total length of 1,914.17 meters (two grand bridges with a total length of 1,593.67 meters and four medium bridge with a total length of 320.5 meters), eleven culverts with a total length of 697.58 meters, two tunnels with a total length of 762.97 meters and one railway station whose building area is 182,074 square meters. It won the Luban Prize for Construction Project in 2012. 

Section III of Guangzhou-Shenzhen-Hong Kong Railway

 

Print Close

og电子 永利体育app 威廉希尔中文 十大博彩网站 正规靠谱的彩票平台