韦德体育-bevictor韦德体育官网-韦德体育官方网站韦德体育

九游会 球赛买球 永利赌场 娱乐网赌 bwin必赢体育官网
Location:Home > detail
Location: Home > News Update > News Update
Xuancheng-Jixi High-Speed Railway Begins Trial Operation
Source: Date:2024年09月09日

At 8:35 AM on August 29, the first trial train, G55201, departed from Xuancheng Station, heading towards Jixi North Station along the newly constructed Xuancheng-Jixi High-Speed Railway. The train ran tests on operational parameters, marking the start of the trial operation phase for the railway, which was built by China Railway Electrification Engineering Group and China Railway No.5 Engineering Group. The full opening of the line is now in its final countdown.

宣绩高铁开始试运行

Located in southern Anhui Province, the newly constructed Xuancheng-Jixi High-Speed Railway has a total length of 111.6 kilometers and a design speed of 350 kilometers per hour. It features three stations: Xuancheng, Ningguo South (a newly built station), and Jixi North. Construction began in March 2021, with static acceptance completed in May this year and joint testing starting in July. The line is expected to be ready for full operation by the end of September.

宣绩高铁开始试运行1

The Xuancheng-Jixi High-Speed Railway is a crucial part of the Suzhou-Anhui-Jiangxi Rapid Railway Corridor and the intercity railway network in the Wanjiang area. It serves as a backbone line in the Yangtze River Delta intercity rail transit network. Once operational, the project will enhance the regional rail network layout, promote the development of tourism resources along the route, and contribute to the establishment of the Huangshan World-Class Leisure, Vacation, and Wellness Tourism Destination. It is also expected to drive high-quality economic growth in the region.

Print Close

太阳城备用官网 澳门新葡京 优德游戏app 新葡京在线 九五至尊游戏网站 足球现金 澳门银河官网网站 香港六合彩官网 英国立博 线上娱乐