韦德体育-bevictor韦德体育官网-韦德体育官方网站韦德体育

赌博网址 皇冠hg 博彩电子游戏 靠谱的网赌 银河娱乐app网址
Location:Home > detail
Location: Home > News Update > News Update
The Phase I Project of SEM Copper Mine Cathode Copper in the DRC Commenced
Source: Date:2024年06月28日

On June 11, the commencement ceremony of the first phase of the SEM Copper Cathode Project in the Democratic Republic of Congo (DRC) was held in the border town of Kasumbalesa between the Democratic Republic of Congo (DRC) and Zambia.

This project marks the first instance of China Railway Sixth Group participating as a general contractor in constructing a wet copper plant in the Congo (DRC) market. China Railway Sixth Group's electrical company is mainly responsible for the civil engineering, housing construction, tailings dam, road, electromechanical, steel structure, HVAC, and other engineering construction of the 30,000-ton wet copper production line.

After the completion of the first phase of the cathode copper project of SEM Copper Mine, it will become a modern large-scale hydrometallurgical copper mine integrating mining, dressing, and smelting. It will have a daily ore processing capacity of 9000 tons and a monthly copper output of 2500 tons.

Print Close

海博体育 华体会 世预赛买球 全球正规博彩公司平台app 足球盘口 最大在线博彩网赌平台推荐 新葡京在线app下载 可靠的网络博彩 澳门银河娱乐最新网址 澳门威尼斯人娱乐官网