韦德体育-bevictor韦德体育官网-韦德体育官方网站韦德体育

升博体育 推荐网络博彩 澳门金沙游戏中心 亚洲体育博彩线上赌博网站 新葡京app平台
Location:Home > detail
Location: Home > News Update > News Update
Chan River Bridge's Continuous Girder of the Rigid Frame Successfully Connected
Source: Date:2024年06月10日

浐河特大桥刚构连续梁合龙1

In the early morning of May 16, the longest and largest bridge of the Xi’an-Ankang High-speed Railway, the Rigid Continuous Girder of the Chan River Bridge, was successfully closed by The First Engineering Bureau of CREC.

Chan River Bridge is located in Baqiao District and Chang'an District of Xi'an City, with a total length of 5333.78 meters. It is designed to cross the Xi’an-Ankang Railway, Chan River, and the planned embankment of Chan River. The main span is (48 + 3 × 80 + 48) meters rigid frame continuous beam. The two rigid-frame main piers are rectangular solid piers, and the other piers are round-ended hollow piers. The structure is 337.5 meters long, has a complex bridge structure design, rugged construction, and high safety risk, which is one of the key and challenging control projects of the Xi’an-Ankang High-speed Railway.

It is reported that the Xi'an-Ankang high-speed railway is the first high-speed railway in southern Shaanxi, with a total length of 170 kilometers. The construction standard is a double-track high-speed railway with a design speed of 350 kilometers per hour. After completion, it will form a fast passenger transport corridor running through the west and linking Chengdu-Chongqing and Guanzhong urban agglomerations with the Ankang-Chongqing high-speed railway.

Print Close

杏彩体育 电竞赌注 3377体育 nba投注 澳门赌场官网 十大网络博彩亚洲赌博平台 彩票十大网站 马博官网 信誉网上彩票 赌博网站最新网址